What We Do
Data Centres: Designed, Built, Operated by One Integrated Team.
Electrical • Mechanical • HVAC • Automation • Facility Management • Project Management
At Ecanet Engineers, we specialise in data centre projects - including modular data centres, hyperscale, colocation, enterprise, and edge facilities. We don’t just design or build. We take full responsibility for the Design‑Build‑Operate lifecycle, integrating electrical, mechanical, HVAC, automation, facility management, and project management under one roof.
Why? Because data centres demand absolute reliability, efficiency, and speed to market. Our approach eliminates handover gaps, reduces risk, and ensures your critical infrastructure performs from day one - and every day after.
Data Centre Design & Build
Tier‑certified design, EPC delivery, feasibility studies, financial modelling, DCIM, security, fire protection, procurement, and modular DC supply - all in one place.
Electrical, Mechanical & HVAC
MCC, switchboard, PLC panel design and manufacture, MV/LV power distribution, HVAC design and licensed electrical contracting.
Project & Facility Management
Turnkey project delivery, asset lifecycle planning, data centre operations, maintenance, and 24/7 on‑site or remote support.
Industrial Automation, Robotics & IT
PLC/SCADA programming, machine safety, vision systems, robotics integration, IoT, cybersecurity, industrial networks, and MES integration.
All-In-One 20 racks Modular Data Centre (bespoke design)
100 racks ITE module with aisle containment (click to enlarge)
Expert with Siemens S7 PLC, TIA/Step 7, WinCC. Proficient with Schneider/Modicon, Rockwell/Allen Bradley ControlLogix, SLC
How We Deliver Data Centre Projects Across the Lifecycle
Design - Data Centre Ready (Operational Readiness)
We start by engineering for performance. Every design decision is made with buildability and long‑term operation in mind.
Power architecture that’s redundant, scalable, and fault‑tolerant - from MV/LV switchgear to UPS, PDU, and backup generation.
Precision cooling and airflow management, including hot/cold aisle containment, humidity control, and free‑cooling options to drive down PUE.
AI-Ready Infrastructure - Engineered for extreme GPU power densities (300W–1,800W per chip) with hybrid liquid-air cooling architectures
A smart automation backbone - BMS, EPMS, DCIM - with carefully placed sensors and control logic that gives you real‑time visibility.
Practical O&M strategies, spare parts planning, fire suppression, and access control – designed in, not bolted on later.
Project controls that keep cost, risk, and schedule on track from day one, with full stakeholder alignment.
Build - Data Centre Tight (Disciplined Execution)
Construction is where good designs prove themselves. We keep every trade coordinated, every test documented, and every standard met.
Electrical installation, termination, and load banking - all switchgear and backup systems commissioned to full load.
Mechanical and HVAC work including equipment setting, piping, ducting, leak testing, air balancing, and airflow verification - because cooling works only when installed right.
Automation programming, panel builds, field device integration, and loop checking - followed by full site‑wide commissioning.
Safe, coordinated shutdowns and site logistics, with pre‑ops documentation and training handover ready before go‑live.
Rigorous project management: critical path tracking, quality control, safety compliance, progress reporting, and change management - no surprises.
Operate - Data Centre Assured (Quality Assurance and Control)
Once live, we don’t disappear. We keep your facility critical, efficient, and compliant - 24/7/365.
24/7 power monitoring, fault response, UPS battery health, generator load testing, and energy optimisation to maximise uptime.
Proactive mechanical and HVAC maintenance - filter changes, coil cleaning, refrigerant checks, fan tuning, and humidity control to protect your PUE and equipment life.
Automated alarm management, logic updates, cybersecurity patching, and performance dashboards – with remote monitoring available.
Daily facility operations including cleaning, security, helpdesk, spare parts inventory, and compliance reporting to Tier, ISO, or NABERS standards.
Continuous improvement and lifecycle cost tracking - we manage upgrades, report against SLAs, and plan asset replacements so you can focus on your core business.
Why ECANET for Data Centres?
Engineered to Perform
Every design, build method, and operational process is optimised for uptime, efficiency, and scalability. We don’t do “just enough” – we engineer for peak performance.
Our Partners
We partner with the world’s leading DC technology vendors – UPS, cooling (HVAC), switchgear, DCIM, automation – with factory‑level support built into our service.
Modular DC
Need speed and scalability? Our modular data centres are pre‑engineered, factory‑tested, and deploy in weeks, not months – fully integrated with our Design‑Build‑Operate model.
Results that last.
We engineer smarter infrastructure - from data centres to industrial systems - designed to perform, scale and last.